Cash-flow projection with a hidden constraint

biz-reason-05suite v1.0text

Quality25%judge panel
Correctness65%deterministic · answer-match
Completeness10%judge panel

Exact prompt sent to every model

Project the daily cash balance from Oct 1 through Dec 31 at each cash event, decide on which of the two dates the equipment purchase should happen, state whether and when the line of credit must be drawn and repaid, and identify the single lowest cash point. Present a table of events with running balance. End with an "ANSWER:" block: purchase date, max line draw, lowest cash balance and its date.